Your data could not be loaded
This sometimes happens after sleep mode or when the connection briefly dropped.
Settings
Company
Projects, assemblies and reports belong to this company. Everyone you invite works in the same projects.
You are a user in this company. Only an administrator can change the details, the subscription and the users.
- Plan
- –
- Status
- –
- Price
- –
- Reports
- –
- Next charge
- –
- Since
- –
Stripe test mode: nothing is actually charged.
Quote
Would you rather have a quote on paper first and then pay by invoice? Request one. While the quote is running, you keep working free for a month.
There is no quote running yet.
A different plan? Get in touch via the contact form.
Users
Invite
Create a link and send it to your colleague. Whoever opens the link creates an account and joins this company. The link is valid for 14 days.
There are no open invitations.
Tabs in the projects
Choose which tabs everyone in this company sees for an assembly. A project or assembly can set it differently, with the button to the right of the tabs. Overview and Reports are always there. Saved immediately.
Only an administrator can change this.
Checks for the whole company
Every check runs the fixed basic checks on the model, the BOM and the drawing. Turn off here what you do not want checked; a project or an assembly can set it differently again. You record your own agreements under Requirements.
Applies to turning off checks and ignoring comments for the whole company. Everyone can do that per project and per assembly. Only an administrator can change this setting.
Basic checks
A choice here applies to all projects, unless a project or assembly sets it differently. Saved immediately.
Ignored comments
These comments no longer appear in the checklist, the 3D model, the drawing and the BOM, not even in later checks.
Company requirements
Record your own agreements as rules with a code. For a check you choose which sets take part; the report states per rule whether it is met, not met, or cannot be determined from the supplied files. Requirements that apply to only one project, such as those of a customer, you record in that project under "Check settings".
How does this work? Explanation and examples
There are no requirement sets yet.
You have reached the maximum of 12 sets.
File storage
Where this company's models, drawings and BOMs are stored. BOMproof always keeps project data and reports itself.
Need your own storage or local files? Let us know, and we would be happy to hear what you use.
Subscription
Your subscription is not active yet
Projects, models and checks are available as soon as your company's subscription is running. Your data stays where it is, you just cannot access it yet.
Ask your company's administrator to activate the subscription.