EBOM and MBOM: what is the difference?

An EBOM is the BOM as engineering designs the product: built up like the model, per function and per assembly. An MBOM is the BOM as production makes it: built up per operation and assembly step, with consumables added. They should connect to each other, but they are not the same and they are not allowed to be.

Published 21 September 2026

In short

  • The EBOM follows the structure of the 3D model, the MBOM follows the order of making
  • The MBOM contains things that are not in the model: welds, paint, glue, shims
  • A check of the model is about the EBOM, not the MBOM
  • Differences are normal; not being able to explain why they are there is the problem

The EBOM: as it was designed

The engineering BOM comes from the model. The structure follows the design: main assembly, subassemblies, parts. Per line a part number, a description, a quantity and a material.

This is the list you can check the model against, because it should match the product structure one to one.

The MBOM: as it is made

The manufacturing BOM is built up according to how the product comes about in the workshop. It contains steps that do not exist in the model: a weldment that is treated as a semi-finished product, a part that is blasted and painted, an assembly order that the model does not know.

What is added in the MBOM

  • Consumables: welding wire, glue, paint, sealant
  • Semi-finished products and intermediate steps that engineering does not see as a part
  • Auxiliary materials and assembly aids
  • A different order and a different grouping of the same parts
  • Sometimes a different quantity, for example because of cutting loss

Why it goes wrong

The problems do not arise because the two lists differ, but because nobody can point out exactly where the difference comes from.

If the EBOM changes and the MBOM lags behind, things are made on an old build-up. And if the MBOM was built by hand from an export of half a year ago, nobody remembers which lines are deliberately different.

That is why checking starts with the EBOM against the model. If that basis is wrong, every derived list is wrong too, and you only notice in the workshop.

What you put on record

It does not have to be complicated. Two agreements keep it workable.

  • The EBOM comes from the model and is not updated by hand. If something is wrong, you change the model.
  • Every deviation in the MBOM is a deliberate choice with a reason, so that when something changes you know what to reassess.

With BOMproof

This work automatically, at every release.

BOMproof puts your STEP model, your PDF drawings and your Excel BOM side by side and points out every deviation: with a pin in the 3D model and a balloon on the drawing. You tick off what is correct.

Method and corrections

This guide describes in our own words how we carry out a check ourselves. We refer to standards by number; the literal text of the standard is not reproduced here, because it is protected by copyright. Found a mistake? Email info@bomproof.nl: we correct it within a week and put the new date at the top.

02 Frequently asked questions

EBOM and MBOM.

01 Do I need both?

If you only design and production is elsewhere, you get far with an EBOM. As soon as you make or assemble yourself, an MBOM arises automatically, whether it is called that or not.

02 Which list does BOMproof check?

The list you provide, against the product structure of your model. In practice that is the EBOM or the BOM on the drawing. Lines that are deliberately not in the model, such as paint or welding wire, show up as lines without a counterpart and you tick those off.

03 What is an indented BOM?

A list in which the structure is visible: subassemblies with their parts below them. The quantity per line then applies per parent assembly and has to be multiplied by it to get the total.

Ready for your first automated check?

Book a 30-minute demo. Bring one of your own designs and see live how BOMproof checks it.